Wastewater Treatment

The following items will be discussed in details
  1. Discuss steps for WW treatment, contaminants removed and what are the benefits of treatment.by preliminary, primary, secondary, advanced treatment, disinfection and de-chlorination Disposal of the effluent and the sludge
  2. EPR- NPDES, TCEQ-TPDES, Clean Water Act, operator licensing, fee and inspection, accidental discharge, Plant permit, segments
  3. Domestic, commercial Industrial WW, inflow – infiltration, fresh and septic WW. Inorganic/organic solids, DO, BOD, COD, TOC Flow in the open and closed channels. C, S, N cycles.
  4. National industrial pre- treatment program, discharge prohibited, .user charge system, grab and composite samples, 10 components of WW-system use ordinance.
  5. Preliminary (screening, grinding, grit removal, grit washing and flow equalization), and primary treatment(sedimentation, BOD reduction) Baffling, short circuiting.
  6. Secondary treatment(activated sludge process), Aerobic, anaerobic and facultative bacteria, DO, Clarifier, rate of return and rate of wasting, SVI, Modifications, aerobic anaerobic and facultative ponds, factors affecting pond operation
  7. TF and RBC operation and maintenance and advanced process Treatments. Filtration/disinfection.
  8. Laboratory control analysis, grab and composite sampling, sample preservation, Determination of BOD, COD, TOC, pH, Total suspended solids, SVI, MCRT, Total solids, DO, Cl2 RES. VSS, OUR, GSA, TKN, Volatile acids, alkalinity.
  9. Calculation of area, volume, gallons% reduction, lbs/dat, mg/LD.T, SVI, F/m, MCRT< GSA, WHP, BHP, MHP.PE, ME & cost of running an electric motor for a day, month and a year.
  10. Questions are always welcomed and encouraged.

Register Here

TCEQ Water
Basic Water unit-I
20 Hrs - $285.00
Surface Water Production-I
24 Hrs - $300.00
Ground water Production
20 Hrs - $285.00
Water Laboratory
20 Hrs - $300.00
TCEQ Wastewater
Basic Wastewater unit-I
20 Hrs - $285.00
Wastewater Collection
20 Hrs - $285.00
Wastewater Treatment
20 Hrs - $285.00
Wastewater Laboratory
20 Hrs - $300.00
TCEQ Water & Wastewater
Utility Calculations
20 Hrs - $285.00
Utility Safety
20 Hrs - $285.00
Advanced Math
10 Hrs - $185.00
Basic Math
8 Hrs - $160.00
TCEQ Irrigation Technician
16 Hrs - $350.00
TCEQ non credit License test prep courses
TCEQ License test prep for Grade C Water
8 Hrs - $185.00
TCEQ License test prep for grade B –Surface water
16 Hrs - $300.00
TCEQ License test prep for grade A Surface Water
32 Hrs - $500.00
TCEQ License test prep for grade C Wastewater
8 Hrs - $185.00
TCEQ License test prep for grade B Wastewater
16 Hrs - $300.00
TCEQ License test prep for grade A Wastewater
32 Hrs - $500.00
TCEQ License test prep for Irrigation Technician
8 Hrs - $185.00
TCEQ License test prep for CSI
8 Hrs - $185.00